ترك رسالة : xinxingxm02@cxxm-iec.com.cn
هاتف : +86 13606094661
HZ25 Infantry Bridge is mainly used for the infantry and airborne troops to overcome obstacles such as hill, river and valley. Through unit composition, the bridge can be launched and recovered very easily by manpower.
• Max. Length: 25m
• Curb Weight: 500kg
• Passage Width: 0.7m
• Pedestrian Path Width: 0.5m
• Load Allocation: Single Soldier (Load Included) About 100kg, Space 4m; Stretcher (2 Lifting Soldiers Included) 250kg, Space 10m
• Erection Time: 30min
• Operators: 20
العلامات :